CEPA Reports and Related Documents for Water Supply

Environmental Impact Evaluation for University of Connecticut Additional Source(s) of Water Supply

CT Office of Policy and Management Sufficiency Memo, Sept. 16, 2013

Board of Trustees Water EIE-ROD Presentation August 7, 2013

FINAL RECORD OF DECISION – EIE, POTENTIAL SOURCES OF WATER SUPPLY

Appendix A Documentation of Notification

Appendix B Hearing Transcript

Appendix C Copies of Written Public Comments

Appendix D Potential Farmland Impacts Along Pipeline Segments

Appendix E Additional Correspondence from Water Utilities

Appendix F Financial Analysis

Appendix G C.G.S. 16a-31(b) OPM Advisory Request Correspondence

The EIE can be viewed by clicking on the sections below:

TITLE & TABLE OF CONTENTS
EXECUTIVE SUMMARY revised 11-16-12
1.0 INTRODUCTION
2.0 CONSULTATION AND COORDINATION
3.0 ALTERNATIVES CONSIDERED
4.0 BACKGROUND INFORMATION
5.0 ALTERNATIVE #1 – NO ACTION OR NO-BUILD
6.0 ALTERNATIVE #2 – REPLACEMENT OF WELL A AT THE FENTON RIVER WELLFIELD
7.0 ALTERNATIVE #3 – INTERCONNECTION WITH THE CONNECTICUT WATER COMPANY
8.0 ALTERNATIVE #4 – INTERCONNECTION WITH THE METROPOLITAN DISTRICT COMMISSION
9.0 ALTERNATIVE #5 – INTERCONNECTION WITH WINDHAM WATER WORKS
10.0 ALTERNATIVE #6 – NEW WELLFIELD ALONG THE WILLIMANTIC RIVER
11.0 ALTERNATIVE #7 – NEW WELLFIELD NEARBY MANSFIELD HOLLOW LAKE
12.0 SELECTION OF PREFERRED ALTERNATIVE
13.0 DOCUMENT PREPARERS
14.0 REFERENCES
Appendix A Scoping Notices & Public Outreach
Appendix B Scoping Comments
Appendix C Culvert Photo Log